Welding & assembly

Dedicated projection welding lines integrated with sub-assembly cells.

Process

  1. 01

    Fixture and electrode validation.

  2. 02

    Parameter programming (current, time, pressure).

  3. 03

    Monitored projection welding.

  4. 04

    Penetration verification and sampled destructive testing.

Equipment

  • Centerline projection welders
  • Integrated sub-assembly cells
  • MIG and TIG stations (in integration)
  • Project-dedicated fixtures

Materials

CRHRHSLACoated steels

Capacity

Welding typesProjection (primary), MIG and TIG in integration
Capacity200–510 KW
MaterialsCR, HR, HSLA and coated
IntegrationSub-assembly cells on the stamping line
IATF 16949ISO 9001PPAP L3

Have a part to quote?

Request a quote